;;;;;;;;;;;;; Into the Black ; Including Dogleg Complex, Yellow Van Passage, etc. *begin ItB ; Connections *equate inblack2.0 inblack1.24 *equate YellowVan.12 inblack2.4 *equate yellowvan2.11 yellowvan.6 *equate testarosaA.15c yellowvan.11 ; inblack2.4 *equate testarosaA.8 testarosaB.A8 *equate testarosaA.16 testarosaC.16 ; Into the Black ; Discovered and surveyed Gavin Lowe, Steve Roberts, Jonathan Cooper, Nobby ; Mumford ; 16/11/96. ; Notes Gavin, Tape Nobby, Instr Steve ; Along MS&D passage, and first part of streamway. *begin inblack1 15 14 5.4 58 0 15 16 25.9 220 -10 ; Station 16 is a cairn, at the bottom of the boulder slope, where the ; passage turns right (Into the Black) ; and another passage goes up to the left (Dogleg Complex) 17 16 30.6 147 5 17 18 31.0 298 -5 ; Station 18 is a cairn 19 18 22.0 86 1 19 20 31.0 348 -2 21 20 25.5 157 0 21 22 29.8 345 -2 23 22 16.4 128 -4 23 24 30.2 334 -5 ; Station 24 is a cairn, on a mudbank to the right *end inblack1 ; End of into the black ; Discovered 16.11.96 Gavin Lowe, Steve Roberts, Jonathan Cooper, Nobby Mumford ; Survey 23.11.96 Gavin Lowe, Steve Roberts, Peter Bolt, Kevin "the squaddie" ; All clino readings are estimates *begin inblack2 1 0 15.35 178 0 1 2 29.80 326 -1 3 2 27.00 134 1 3 4 18.27 301 -1 ; station 4 is cairn, near juntion with ; Yellow Van 4 5 29.00 306 +10 6 5 16.85 127 -20 ; station 6 is cairn just before Rock ; 'n' Roll choke *end inblack2 ;;;;;;;;;;;;;;;;;;; Now the side passages, described in a downstream direction ;;;;;;;;;;;;;;;;;;;;; Yellow Van, etc ; Yellow Van Passage ; Discovered and Survey 23.11.96 Gavin Lowe, Steve Roberts, Peter Bolt, Kevin ; Passage to right before Rock and Roll choke ; All clino readings are estimates *begin YellowVan 11 12 5.68 36 - 10 11 21.43 8 - 10 9 9.65 200 - 8 9 10.00 325 - 8 7 19.47 188 - 0 7 10.55 26 - ; station 0 is large cairn 0 1 25.35 192 - 2 1 19.40 33 - 2 3 15.40 184 - 4 3 12.60 58 - 4 5 12.80 182 - 6 5 5.48 2 - ; station 6 is cairn, just before passage ; cuts right *end YellowVan ; before squeeze and ; (current) (previous) terminal choke ;yellow van passage ;extension pushed by Pauline and Tim B c.15-12-96 ;surveyed 21-12-96 by Chris (notes) + Jonathon (instruments) ;2nd choke beyond sta 1 dug by CJD, JC, Becka Lawson 21-12-96. ;'some work done on suspension, but kingpin needs heavier tools for removal. ;'will get back on the road South in time' ;Clino estimated *begin yellowvan2 ;From to tape compass clino 2 1 6.01 174 -7 ;1 is marked, low cairn in crawl just before present end chamber 3 2 5.97 173 - 4 3 1.98 168 - 5 4 4.38 209.5 - ;5 is marked, left turn with crawl straight ahead 6 5 9.45 321.5 - 7 6 4.98 296 - 8 7 4.23 280 +45 ;7 is roof above 1st choke breakthrough 9 8 4.10 256 - 10 9 2.97 302 - 11 10 1.42 198 - ;11 is sta. 6 of SGR,GL,PB,K (was foreplay) *end yellowvan2 ; Testarosa series 18.1.97 Pauline Rigby, Tim Barter ; stn 15c is the PSS at beginning of Yellow Van *begin testarosaA 1 2 2.5 - down 2 3 2.9 145 - 3 4 4.4 159 - 4 5 5.2 134 - 5 6 1.1 - down 6 7 5.1 148 - 7 8 2.8 099 -30 8 9 6.2 112 - 9 10 1.2 - down 10 11 2.6 139 - 11 12 1.9 - down 12 13 2.6 153 - 13 14 3.6 - down 14 15 6.2 015 - 15 16 10.9 355 +15 16 17 4.2 307 - 17 18 1.5 - up 18 19 8.9 357 - 17 17a 7.6 192 +15 15 15a 5.4 043 - 15b 15a 12.1 258 +30 15b 15c 10.4 116 - *end testarosaA *begin testarosaB 1 2 5.9 018 - 2 3 0.4 - up 3 4 5.2 007 - 4 5 5.1 009 - 5 6 1.9 340 - 6 7 0.7 - down 7 8 2.8 349 - 8 9 5.0 341 - 9 10 1.6 039 - 10 A8 2.6 345 -45 *end testarosaB *begin testarosaC 17 16 4.10 112 - 17 18 1.25 - up 18 19 4.10 328 - 19 20 1.35 - down 21 20 7.8 024 - 21 22 4.5 272 - 23 22 8.2 177 - 23 24 7.8 012 - 25 24 5.3 136 - 25 wall 2.0 198 - *end testarosaC *end ItB